Cases of success in Mexico
- Pharmaceutical products CHINOIN
Development of conceptual design, basic engineering, engineering of detail, hiring of goods and services, mechanical installation, qualification of the installation, qualification of the operation, transfer of the Injectable production of Mexico, D.F. to Aguascalientes.
Construction: 2 650m2
Value of the investment: 16 million of euros
Result in cost: 1% less to the budgeted
Execution time: 26 months 2003/2005
- Rheem, Mexicali
Installation of farm of tanks (polieteres and isocianatos) and systems of metering for polyurethane foam, in collaboration with Hennecke GmbH.
Value of the investment: 300 000 USD
Execution time: 2001/2002
- Bayer IMSA, Monterrey
Coordination of engineering and direction for the construction of a new plant for manufacture of polycarbonate lamina of double wall. The project included the selection and buys of the land.
Value of the investment: 5 million of USD
Execution time: 2000/2001
Technical Qualification
- Unilever
They increased the labour abilities in operators of line and maintenance personnel of the Ice cream Division (Tultitlán Plant), through a qualification program that today add more than 2200 hours distributed to 560 participants.
- Conservas La Costeña
They improved the techniques in the development of the operative activities and process control of 1300 collaborators, through a qualification program that today add more than 2300 hours in front of group.
- Grupo Jumex
They obtained improvements in the productive processes, as well as diminution of waste of time in the production areas through ample programs of qualification, in which mechanics and the mechatronics stood out referring to.